Capacity: 100 MW
Civil Works: Headrace Tunnel 4.15m, Modified Horse-shoe shaped 1358m long excavation & 8010m long Concrete Lining.
Capacity: 270 MW
Infra Works: Survey and Investigation Services &Basic infrastructure Development
(Roads/Culverts/Bridges/Pathways/Temporary Colony)
Civil Works: Exploratory tunnel of size 3.5m x 3.0mat the Power House and of size 2.5m x 2.2mat the Dam Site
Capacity: 390MW
Infra Works: Survey and Investigation Services & Basic infrastructure Development (Roads / Bridges / Exploratory tunnels)
Capacity: 4 x 90 MW
Infra Works: Survey and Investigation Services & Works and Services
(Roads, Bridges, Pathways, Exploratory tunnels of size 2.2m x 2.0m)
Capacity: 3 x 45 MW
Infra Works: Survey and Investigation Services & Works and Services
Capacity: 3 x 30 MW
Infra Works: Survey and Investigation Services & Works and Services
Capacity: 7 x 38.57 MW
Infra Works: Survey and Investigation Services & Works and Services
Capacity: 4 x 250 MW
Infra Works: Survey and Investigation Services & Works and Services