| Project Name: |
Teesta-III Hydro Electric Project |
| Capacity: |
1200 MW |
| Client Name: |
Teesta Urja Ltd. |
Brief Description
Teesta stage III, is a 1200 MW Hydro Electric Project in the state of Sikkim on the Teesta River. Abir is executing HRT, Surge Shaft, Pressure Shaft, Power House, Transformer Cavern, TRT, MAT, Cable Tunnel, and other Power House Tunnels etc. All infra works like Roads, Buildings, Bridges and Muck Retaining Structures are also entrusted to Abir.
| Project Name: |
Malana-II Hydro Electric Project |
| Capacity: |
100 MW |
| Client Name: |
Everest Power Pvt. Ltd. |
Brief Description
Malana stage II is a 100 MW Hydro Electric Project. In the Kullu District of Himanchal Pradesh on Malana nala. Abir is doing all civil, H & M and E & M works for Malana – II H.E.P. consisting of HRT, Surge Shaft, Pressure Shaft, Power House, Transformer Cavern, TRT, MAT, Cable Tunnel, and other Power House Tunnels etc. All infra works like Roads, Buildings, Bridges and Muck Retaining Structures. Supplying and fixing of Generating Units and turbines etc. Complete in all respects.
| Project Name: |
Sainj Hydro Electric Project |
| Capacity: |
5 MW |
| Client Name: |
Sainj Hydro Power Pvt. Ltd. |
Brief Description
Sainj H.E.P. is a 5 MW HEP Located in District Shimla Himanchal Pradesh on Sainj Khad. Abir is doing all civil, H & M and E & M works for Sainj Hydro Electric Project consisting of HRT, Surge Shaft, Pressure Shaft, Power House, Transformer Cavern, TRT, MAT, Cable Tunnel, and other Power House Tunnels, etc. All infra works like Roads, Buildings, Bridges and Muck Retaining Structures. Supplying and fixing of generating units and Turbines etc. Complete in all respects.
| Project Name: |
Demwe Hydro Electric Project |
| Capacity: |
3000 MW |
| Client Name: |
Athena Demwe Power Pvt. Ltd. |
Brief Description
Demwe is a new project in the state of Arunachal Pradesh. Site investigation work is going on in full swing. The project has been planned in two stages on River Lohit – Upper Demwe to generate 1800 MW and Lower Demwe to generate 1200 MW. Abir is constructing all the new roads and pathways including strengthening of old roads and pathways for starting of works. Abir is also doing tunneling work on the right and left banks at upper and lower dams.
| Project Name: |
Kynshi – I Hydro Electric Projects |
| Capacity: |
450 MW |
| Client Name: |
Athena Kynshi Power Pvt. Ltd. |
Brief Description
Kynshi is a new project in the state of Meghalaya. Site investigation work is going on in full swing. Project is located in the west Khasi Hills, on river Kynshi. Abir is constructing all the new roads and pathways including strengthening of old roads and pathways for stability of works.
|