Hydro Mechanical

A.    2 x 50 MW Malana – II Hydro Electric Project, Himachal Pradesh
Abir completed Design, Fabrication, Supply & Installation of Following Hydro Mechanical Equipment:
  •            2 Panels of 7.0m X 2.03m Intake Trash Rack (1set) In dam block-4
  •            3.0m x 3.0m Intake Emergency Gate & 2.2m x 2.2m Intake Service Gate
  •           2nos.  4.0m x 5.5m Spillway Radial Gate & Stop log with hydraulic hoist  in dam block-5
  •            20T Gantry Crane – (1no)
  •            2.2m x2.2m Sliding (Bonnet) Gate (1no) in Surge Shaft
  •           2.5m X1.8m TRT Gate 2nos. with hydraulic hoist  & 5.0m X3.0m TRT Outfall Gate (1no)
  •           2.5m dia. Buried penstocks 850 tons
B.    2 x 2.5 MW Sainj Hydro Electric Project, Himachal Pradesh
  •            Design, Fabrication, Supply & Installation of Following Hydro mechanical Equipment:
  •            3 Nos 7m x 5m Radial gates & Stoplogs operated with hydraulic hoist
  •           1.5m x 1.5m Intake Service Gate; 3.36m x 2.8m TRT Gates
C.    6 x 200 MW Teesta III Hydro Electric Project, Sikkim
  •            Design, Fabrication, Supply & Installation of Diversion tunnel stoplogs along with monorail crqne hoist
D.    2 x 8 MW Patikari Hydro Electric Project, Himachal Pradesh
  •            Design, Fabrication, Supply & Installation of Following Hydro Mechanical Equipment
  •            1.8 m x 1.2m Scour Service Gate & stoplogs
  •            Trash racks, 3.25m x 1.4m Desander gate
  •            6nos of 0.5m x 0.5m Silt flushing;& 2.05m x 4.05 Tailrace gates
  •            2 nos 1.6m dia 65m aqueducts along with bridges
  •            3.0 m diameter steel surge shaft; Butterfly valve along with 1.3m dia. Penstocks 400t