A. 2 x 50 MW Malana – II Hydro Electric Project, Himachal Pradesh
- Abir completed Supply & Installation of 2 Nos. 50 MW units Main Plant Equipment will all auxiliaries.
Pre-commissioning Checks are in progress
- All Panels and drives for LTAC System has been installed in position and field test completed
- Plant DC System has been installed and commissioned
- Power and Control Cable for the entire Electrical System has been completed
- 132 kV Substation equipment has been installed and pre-commissioning tests will be completed by this month
- Grounding & Lighting system work has been completed
B. 2 x 2.5 MW Sainj Hydro Electric Project, Himachal Pradesh
- Abir completed Supply & Installation of 2 Nos. 2.5 MW units Main Plant Equipment will all auxiliaries
- LTAC System & DC System has been installed in position and field test completed
- Power and Control Cable for the entire Electrical System has been completed
- 33 kV Substation equipment has been installed at Plant & Salai Substation
- Grounding & Lighting system work has been completed
C. 2 x 8 MW Patikari Hydro Electric Project, Himachal Pradesh
- Completed Construction Power Substation at Mangan / Adit – V & associated 8 – kM long 11 kV Transmission Line
D. 2 x 8 MW Patikari Hydro Electric Project, Himachal Pradesh
- Completed Supply, Installation, Testing & Commissioning of 33 KV Substation at Patikari Power House & Pandoh Polling Station along with 16 kM long double circuit Transmission Line
|