A.    2 x 50 MW Malana – II Hydro Electric Project, Himachal Pradesh
  •           Abir completed Supply & Installation of 2 Nos. 50 MW units Main Plant Equipment will all auxiliaries.
    Pre-commissioning Checks are in progress
  •          All Panels and drives for LTAC System has been installed in position and field test completed
  •           Plant DC System has been installed and commissioned
  •           Power and Control Cable for the entire Electrical System has been completed
  •           132 kV Substation equipment has been installed and pre-commissioning tests will be completed by this month
  •           Grounding & Lighting system work has been completed
B.    2 x 2.5 MW Sainj Hydro Electric Project, Himachal Pradesh
  •           Abir completed Supply & Installation of 2 Nos. 2.5 MW units Main Plant Equipment will all auxiliaries
  •           LTAC System & DC System has been installed in position and field test completed
  •           Power and Control Cable for the entire Electrical System has been completed
  •           33 kV Substation equipment has been installed at Plant & Salai Substation
  •           Grounding & Lighting system work has been completed
C.    2 x 8 MW Patikari Hydro Electric Project, Himachal Pradesh
  •           Completed Construction Power Substation at Mangan / Adit – V & associated 8 – kM long 11 kV Transmission Line
D.    2 x 8 MW Patikari Hydro Electric Project, Himachal Pradesh
  •           Completed Supply, Installation, Testing & Commissioning of 33 KV Substation at Patikari Power House & Pandoh Polling Station along with 16 kM long double circuit Transmission Line